Installation Process

Before you Begin

General Installation Guidance

Obtain an understanding of the environment.

Gotchas

Find out where others try to take shortcuts and run into trouble. 

First Step - Install the network cabinet and equipment

Assemble the cabinet

Follow the instruction sheet provided with the cabinet - look at these pictures of the vertical mounting support brackets. 

Install the network devices in the cabinet

Review the standard layout of the network equipment as shown in these pictures

Install the pay station base

Model EP13 - base install

Use these pictures as your guide to install the Model EP13 base. 

Models EP21, S2, O - base install

Use these pictures as your guide to install the Models EP21, S2, and O base. 

Something new is coming to Nashville

Come to the ICA in Nashville to see what we are unveiling.

Install the pay station top hat

Model EP13 - top hat install

Use these pictures as your guide to install the Model EP13 top hat. 

Model EP21 - top hat install

Use these pictures as your guide to install the Model EP21 top hat. 

Model O - top hat install

Use these pictures as your guide to install the Model O top hat. 

Model S2 - top hat install

Use these pictures as your guide to install the Model S2 top hat. 

Retrofit Doors (anticipated delivery Q3-2024)

Hamilton ACW/Goldline replacement

Follow this guide to replace your existing ACW/Goldline door. 

Unitec Wash Select II (WS2) replacement

Follow this guide to replace your existing WS2 door.

Other door options

Contact us if you need another style door replacement and we will see if we can do it.

In-Bay Automatic (IBA) – Install the I/O interface (a.k.a. Sealevel)

Determine voltage requirements

Print this form and fill it out for each bay. You must provide this completed form to Dencar for support during turn-up if your car wash equipment is not on the quick reference guide list.

Quick reference guides - wire the Sea Level I/O interface to the car wash equipment

Please help us build quick reference guides for your equipment type if yours is not listed here. Your peers will appreciate you.

Configure the I/O interface between car wash equipment and pay station

Configure the Sea Level I/O interface via the Dencar Control Console & Customer Management Portal

Tunnel configuration

Equipment placement - tunnel layout

Overview of the equipment and placement in a tunnel configuration 

Gate programming

Follow these steps to configure your gate 


Overpass - "Keep your Kiosk" (anticipated delivery Summer 2024)

Hybrid App/LPR Integration

What is hybrid app/LPR integration and how does it work? 

Installation Procedure

Step-by-step instructions to install the Overpass hardware, network, and LPR camera to your existing pay station. 

Stand Alone Activation Module

Vacuums, Self-Serve, etc.

Review this documentation for module install, QR sticker ordering, and use.

Gas Pump Installation

Code Generating Computer

Follow these steps to complete the installation of your Code Generating Computer

Testing Procedures

Scenarios

Run through each of these tests to ensure everything is in working order 

Installation close out

Compare your install

 Upload pictures of your install so we can provide feedback and support you down the road.