Your cart is currently empty!
- Install the network cabinet and equipment
- Assemble the cabinet – follow the instruction sheet provided with the network cabinet
- Install the network devices in the cabinet
- Wire the devices
- Networking gotchas
- General installation guidance
- Install the pay station base
- Model EP13 – base install
- Models EP21, O, S2 – base install
- Install the pay station top hat
- Model EP13 – top hat install
- Model EP21
- Model O
- Model S2
- In-Bay Automatic (IBA) – Install the I/O interface (a.k.a. Sealevel)
- Determine voltage requirements – print this form <click here> and fill it out for each bay. You must provide this completed form to Dencar for support during turn-up.
- Wire the Sea Level I/O interface to the car wash equipment
- Configure the Sea Level I/O interface via the Dencar Control Console & Customer Management Portal
- Follow these testing procedures